8 What matters should be noted when removing the construction best quality shuttering ply board?

1, the construction cheap shuttering ply should be carried out in accordance with the provisions of the plate design, follow the first support after demolition,shuttering plywood sheets first non-load-bearing parts,…

Continue Reading8 What matters should be noted when removing the construction best quality shuttering ply board?

5 What are the requirements for dismantling the shuttering plywood of post-tensioned prestressed concrete structure?

For shuttering plywood price post-tensioned prestressed concrete members, the side modules should be dismantled before prestressing tensioning; the dismantling of shuttering plywood 12mm brackets should be carried out in accordance…

Continue Reading5 What are the requirements for dismantling the shuttering plywood of post-tensioned prestressed concrete structure?

What are the requirements for the arching of cast-in-place concrete beams and slabs when shuttering plywood 18mm building formwork is supported?

A: The specification stipulates that for cast-in-place concrete beams and slabs with a span of not less than 4m, the film faced shuttering plywood should be arched according to the…

Continue ReadingWhat are the requirements for the arching of cast-in-place concrete beams and slabs when shuttering plywood 18mm building formwork is supported?